Pedestrian Aerial Walkway at Sea-Tac Arrivals Facility
Construction, transportation and installation of 320ft long, 1,500 ton pedestrian bridge 110ft in the air.
Bethesda Metro
Waterproofing of Red Line tunnel at Bethesda.
The Pentagon
Following the 9/11 attack, KCE were called upon to provide emergency engineering, post-collapse assistance and, then, to be responsible for the design and reconstruction of the structurally damaged areas of the building, and tenant work.
The Pentagon
Following the 9/11 attack, KCE were called upon to provide emergency engineering, post-collapse assistance and, then, to be responsible for the design and reconstruction of the structurally damaged areas of the building, and tenant work.
The Pentagon
Following the 9/11 attack, KCE were called upon to provide emergency engineering, post-collapse assistance and, then, to be responsible for the design and reconstruction of the structurally damaged areas of the building, and tenant work.
655 New York Avenue
756,000 Sq Ft of Office & Retail space and Historic buildings
655 New York Avenue
756,000 Sq Ft of Office & Retail space and Historic buildings
655 New York Avenue
756,000 Sq Ft of Office & Retail space and Historic buildings
Crane collapse at National Cathedral
Stabilization of the crane and surroundings to make site safe.
Forensic analysis of the cause.
Restoring the crane to its rightful position in a safe manner
Crane collapse at National Cathedral
Stabilization of the crane and surroundings to make site safe.
Forensic analysis of the cause.
Restoring the crane to its rightful position in a safe manner
Crane collapse at National Cathedral
Stabilization of the crane and surroundings to make site safe.
Forensic analysis of the cause.
Restoring the crane to its rightful position in a safe manner
Investigation of structural issues
Conversion of an existing indoor pool facility into a 279 seat performing arts theatre.
Lab School of Washington
St. Elizabeth's.
Preservation / restoration of National Historic landmark
St. Elizabeth's
Preservation / restoration of National Historic landmark.
St. Elizabeth's
Preservation / restoration of National Historic landmark.
USPTO
U.S. Patent and Trademark Office Headquarters.
2.5 Million square feet.
Structural design, 6 buildings, 2 strip office buildings & 2 parking garages.
USPTO
U.S. Patent and Trademark Office Headquarters.
2.5 Million square feet.
Structural design, 6 buildings, 2 strip office buildings & 2 parking garages.
USPTO
U.S. Patent and Trademark Office Headquarters.
2.5 Million square feet.
Structural design, 6 buildings, 2 strip office buildings & 2 parking garage
Apex Building
Apex Building
Investigation of unplanned collapse during demolition of existing building.
Apex Building
Investigation of unplanned collapse during demolition of existing building.
Investigation of unplanned collapse during demolition of existing building
Alex Renew
Peer review of structural documents for Nitrogen upgrade tank installation
Alex Renew
Peer review of structural documents for Nitrogen upgrade tank installation.
Alex Renew
Peer review of structural documents for Nitrogen upgrade tank installation.
Multi-story, mixed use project
Office & Residential 30-Story Tower
Carlyle South
25-Story Office Complex
This slideshow showed just a few of our projects.
For additional projects, please check the links in the menu above, or on any of the icons below
This slideshow showed just a few of our projects.
For additional projects, please check the links in the menu above, or on any of the icons below.